Proposal
Under the current submission, the applicant is proposing to rezone a portion of the subject lands from Development ‘D’ zone to site specific RESV1 and RESV2 to permit the proposed residential uses, as well as Open Space and Environmental Protection Zones. The portion of the property located north of hydro lines, which is currently zoned Rural ‘RU’ and two portions located south of the hydro line, which are currently zoned Development ‘D’, will not be changed as a result of the proposed zoning amendment. Additionally, no zoning changes are proposed on some regulated lands and “Other Lands Owned by the Developer” within environmentally sensitive areas that could be considered for future development under a separate planning approval process.
Subject lands/Site Location/Property
Municipal address of the Subject land is 3852 Ganaraska Road. The subject land is located on north of Ganaraska Road and east of Mill Street, in the Rural Area of the Municipality of Port Hope.
The subject land is currently occupied by two existing structures, including the 2 storey single detached dwelling and a barn.
Applicant
Monument Goematics on behalf of Mistral Land Development Inc.
Supporting documentation submitted by the applicant
Note: If you require any of the following documents in an accessible format, please contact the Planning Division at 905-885-2431.
Municipality of Port Hope has deemed the application complete on June 7, 2022 and a Public Meeting took place on August 3 2022. A review of the 3rd submission is currently underway.
The Public Review period for the proposed Draft Plan of Subdivision and Zoning By-law Amendment is open for public commenting. Public can provide comments now until a council decision is made.
Submit a comment by emailing us.
- Submission Cover Letter and Comment Matrix prepared by Monument Geomatics on December 23rd, 2022.
- Draft Plan of Subdivision prepared by Monument Geomatics, revised on December 6th, 2022.
- Environmental Impact Study prepared by Cambium Inc., on December 12th, 2022.
- GRCA Hydrogeology Comment Response prepared by The Greer Galloway Group Inc. on December 19 2022
- Planning Justification Report prepared by Ecovue Consulting Services
- Servicing and Stormwater Management Report prepared by Monument Geomatics, revised December 20th, 2022
- Site Plan, prepared by Monument Geomatics, revised December 15, 2022
- Traffic Study Report prepared by Tranplan Associates
- Evaluation of ANSI prepared by GHD Limited in December 2021
- Geotechnical Report prepared by Terraspec Engineering Inc. on May 6th, 2021
- Hydrogeological and Servicing Assessment prepared by Greer Galloway Group Inc. in April 2021
- Phase I Environmental Site Assessment prepared by Greer Galloway Group Inc. in May 2021
- Site Access Letter prepared by Monument Geomatics on April 18, 2021
- Block 104 Site Plan prepared by Monument Geomatics
- Stage 1 and Stage 2 Archaeological Assessment prepared by Northeastern Archaeological Associates Ltd
- Response Letter to Ganaraska Conservation’s Hydrogeology Review Comments prepared by Greer Galloway Group Inc. on September 15 2022
Statutory Public Meeting
Please note that a required statutory public meeting was held on August 3, 2022, in-person in accordance with the Planning Act, R.S.O. 1990, c.P. 13. and posted to this website. For more information on the Public Meeting please follow the link:
Public Meeting - August 3, 2022ContactTheodhora Merepeza, Manager, Planning
905-885-2431 ext. 2507