News
Search
Water Infrastructure Maintenance
Posted on Tuesday, June 21, 2022 03:51 PM
As a result of routine water infrastructure maintenance today, residents with properties on the following streets may notice rust-coloured water when turning on the taps this afternoon / evening:
- Victoria Street S.
- Bramley Street S.
- Strachan Street
- Sherbourne Street
- Durham Street
- Trafalgar Street
The water is safe for use. Residents can flush a cold water tap for five to seven minutes to clear the rust-colour.
2022-06-21
Special Meeting for Walton Street Reconstruction Project – Phase 2 Design
Posted on Thursday, June 16, 2022 03:05 PM
Residents are advised that a Special Meeting of the Works and Engineering Committee will be held virtually on Wednesday, June 22, 2022, beginning at 6:30 p.m. The purpose of the meeting is to allow Members of Council to review and consider proposed designs for Phase 2 of the Walton Street Reconstruction project (Pine St. to Mill Street).
During the meeting, the consultant will present proposed design options to be considered and share feedback on the proposed options received to date.
The...
E-Billing Has Arrived in Port Hope
Posted on Thursday, June 16, 2022 08:42 AM
Residents are advised that our e-billing services are now available for tax and water/wastewater accounts. An e-bill includes the same information as a paper bill, and it is delivered directly to your email inbox. You will receive your e-bill quicker than if sent by mail and you are reducing paper waste in our community. If you choose, you have the option to print the bill or save it digitally for your records.
For more information and to sign up for e-billing for your tax and/or water bills,...
Rose Glen Road Reconstruction Begins June 20
Posted on Tuesday, June 14, 2022 03:32 PM
Residents are advised that the Rose Glen Road Reconstruction project will begin on Monday, June 20, 2022, and is scheduled to last approximately five months. This project has long been a request advocated by many residents over time. The work includes new traffic signals at Croft Street and Rose Glen Road, a multi-use path to accommodate cyclists and pedestrians along the west/south side, and a sidewalk for pedestrians along the east/north side of the road.
Temporary road closuresDuring this...
Temporary Closure of Intersection at Walton and Pine Streets
Posted on Monday, June 13, 2022 04:15 PM
Updated June 27, 2022
This closure is now complete and the Pine and Walton intersection is open to vehicles. Please remember, Walton Street (from Julia Street to Pine Street) remains closed for the duration of the project.
Updated June 24, 2022
The closure of this intersection has been extended to the evening of Wednesday, June 29. If the current issues are resolved faster than anticipated, the intersection will be opened upon completion. We appreciate your patience with this delay.
Updated June 16...